GreenWood Bridges

There are a variety of sizes and load capacities, the prices are shown also. Please call back with questions.

For these standard bridges to be installed you need your banks to be firm (“Good Ground” as defined by NZBC), free from scouring and well vegetated. We also require the bottom of the bridge to be above the high water / flood water level by at least 400mm or high enough so that in the event of flooding, debris does not disturb the bridge (as is preferred for all bridges).

The prices shown are for the materials (materials for abutments, bearers, 200x100mm decking, running boards, hardware, materials for side fences of kerbing, 2 x bridge signs (bridge signs as per legal compliance), plans, PS1) delivered (unloading may be required on arrival), and exclude installation.

As a guide for the installation – good ground conditions and good access to both sides of the crossing is assumed. A tractor with a bucket or FEL (or better still a digger) that is available or the builders can bring one at extra cost. Assumes each bank is approximately level with the other then the installation should take approx. 3-3.5 days for 2 builders / fencers for a 4m clearspan (6m platform) bridge. For a larger bridge, say 8m clearspan, allow up to 4-5 days for 2 builders. Plus, if anchor piles required at each end add this time to drive the piles plus the concrete collar around the top (approx.) 600mm of these piles.

Any on-site work is not part of Greenwood’s kitset and plans offer: the builder or fencer will invoice you directly for this, but we can normally recommend a local contractor to you.

If ground conditions are not “Good Ground” then it might be that anchor poles need to be driven either side of bridge at each end (4 in total). This would be at extra cost. To be certain your ground is “good ground” you may wish to have a local engineer verify this by visiting the site and testing the ground conditions. This is your cost. Unless ground is Good Ground, then a specific engineered design is required, at extra cost.

In summary Greenwood verifies the bridge structure is compliant (all GreenWood bridges are engineered by an independent engineer), you to verify your ground conditions, assembly has been completely properly and to maintain the bridge during it’s lifetime. Note – while a bridge’s capacity may be max 12,000kg, the bridge could possibly still support a 24,000kg truck (for example) as often, especially for shorter bridges, much of the truck is not on the bridge at the same time. Prices for the Greenwood engineered kitset bridges-

All GreenWood Bridges Are:

ENGINEERED & CERTIFIED

All Greenwood bridges are engineered

VERY ECONOMICAL

A very economical option for many waterway crossings

EXTREMELY STRONG AND DURABLE

GreenWood Sheds are designed to last for many years

SIMPLE

One kitset, engineered to do the job!

EASY INSTALLATION

Quick to install – no specialist heavy equipment needed

VERY LOW MAINTENANCE

Virtually maintenance free – unlike some culverts

SAVE TIME

Faster and cleaner crossings

Bridge Prices at Width of 3m - 3.6m below

For 3.6m wide bridges add 12% to the above prices. Prices exclude gst, valid as at Aug 2022, prices may change without notice, delivered on farm subject to location / unloading facilities (extra freight cost may apply). GreenWood’s terms and sale conditions apply with all purchases.

Note – the maximum clearspan is 8m.

We have special low bridge prices for a 3m clearspan (5.4m platform length) x 3m wide GreenWood engineered bridge kitset designed to carry 6000 kgs. (prices subject to change, please call for details).

Kitset includes:

  • H5 bearers and bearer supports
  • H4 decking and running boards
  • Kerbing or side fences
  • Fixings
  • 2 durable bridge signs as required by law
  • Plans/drawings
  • Producer Statement

Additional Information

Every bridge comes with an Independent engineer’s Producer Statement.

To ensure a smooth construction process and the longevity of our bridges, certain requirements must be met by landowners.

Landowner’s responsibilities include:
  • Banks to be firm (“good ground”), free from scouring and well vegetated.
  • Bottom of bridge to be above the high water/flood water level by at least 400mm or high enough so that in the event of flooding debris does not disturb the bridge.
  • To assist the construction, good access to both sides of waterway is a big help too!

Consents are required in various circumstances. Independent engineer’s Producer Statement issued with each bridge. GreenWood Bridges are for on-farm or on private property for private use. GreenWood’s engineered farm bridges are not designed for public roads or public use.